Track installation and utility work on the Lovejoy ramp thru 9th & Lovejoy intersection Weeks of Aug 9, Aug 16, Aug 23

  • NW Lovejoy ramp to the bridge will be closed east of 9th for this work.
  • Beginning July 28 the track construction will cross 9th Ave on Lovejoy closing the intersection.
  • Driveway access will be accommodated.
  • Sidewalks to remain open.
  • Sewer work from Lovejoy to Marshall on 9th Week of Aug 16

  • Lanes may be closed at each intersection to facilitate the installation of the lining
  • This work may result in a chemical-like odor in the surrounding area and will require the use of a compressor.
  • OCS and Traffic Signal Foundation/Conduit installation 11th/10th/9th & Lovejoy
    Weeks of Aug 9, Aug 16, Aug 23

  • Expect intermittent lane closures.
  • The weeks of Aug 9 and Aug 16 the work hours will be between 7:00 AM and 4:00PM
  • Work will occur at night the week of Aug 23. Work hours will be from 11:30PM to 5:30AM.
  • Leave a Reply

    (required)

    (required)

    You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

     
    © 2011 Pearl District Neighborhood Association log in Suffusion theme by Sayontan Sinha